2008
Paulínia/São Paulo - Brazil

The project developed for the Paulínia Municipal Hospital includes the refurbishment of Block I and the creation of the Block II. Block I covers 10.000 m² in one single floor which formerly housed the hospital’s entire activities.

  • Client

    São Paulo State Department of Health

With the new project, the Block I concentrates the service, utilities and administration areas, an auditorium, Obstetric Center and Maternity Ward, in addition to Hospitalization Ward and Day Unit. Block II was designed to house the First Aid, Surgical Theatre, ICU - Intensive Care Unit, parking and helipad, covering three floors. With this new block it was possible to restructure nearby public areas and create a small square next to the hospital.

Rendered images of the project.

Datasheet

  • Project Year:

    2008

  • Built Area:

    22.726m²

  • Site Area:

    26.767,00m²

  • Capacity:

    114 Beds

  • Services Provided:

    Architeture

  • Built Year:

    2008

  • Mep Design:

    Eleteng Engineering

  • Structure:

    Carlos Leal Engenheiros Consultores Ltda

  • Construction:

    Planova