2003
Sao Paulo, Brazil

The Project has been developed in order to assist a program with 160 hospital beds, 74 CCU beds (50 for general CCU and 24 coronary CCU), surgery center with 8 operating rooms and hemodynamic sector with 6 rooms, totaling 25.000,00 m2 of built area, fully dedicated to heart treatment.

  • Client

    São Paulo state Department of Health

Datasheet

  • Project Year:

    2003

  • Built Year:

    2007

  • Construction:

    Unitec

  • Mep Design:

    Mbm Engineering Services

  • Structure:

    De Luca Engenharia